Currently furious SWD refurbishing activity is going on in HAL III stage area. It consists mainly of providing uniform RCC slab covers at suitable height in relation to that of the road center.
.
Picture -1. A typical road corner 90 degree SWD junction which existed earlier is shown above.
.
Picture 2 one more example
In the process, granite slab covers where ever exiting, are taken out and broken in to manageable pieces to facilitate easy transport to crushing factories.
.
Picture 3 – Example of Original Granite slabs along with those broken
.
Picture 4 Crushed Stone pellets from quarry
Invariably we residents have granite slabs covering the SWDs in front of our entry gates. These are being taken out for clearing loads of accumulated mud in the drain. They are then assembled back to the Original condition
..
Picture 5 – Clearing of loads of mud accumulated in front of a typical gate
The contractor has no specific provision for water. Hence the workers do take water from the residential houses for drinking and mixing cement concrete regularly. There is no concrete curing as such in existence. Few residents like my self do the curing at our site boundary.
.
Picture 6 – An SWD covered by short RCC slabs.
Notice the RCC slabs are of short width, thus making an extra unwanted step. I called up Mr. Vijay Kumar the husband of the corporater Sumitra Vijay Kumar. He promised to inform the contractor. It was around 8PM when this happened. I was pleasantly surprised to find the correct size slabs arriving early morning!
.
Picture 7 – The SWD covered by Long RCC slabs.
.
Picture – 8 preparing for laying the foot path tiles
COMMENTS

pathykv - 23 April, 2013 - 09:50
Mr. Anantram,
Any idea who designs these foot paths and to what Standards/Norms?
K.V.Pathy

psaram42 - 29 April, 2013 - 06:56
The newly laid out SWD covers are the stray dog favourites. The stray dogs are using the covered SWDs as roads. Under a shady tree it is a nice bed for siesta.

psaram42 - 6 May, 2013 - 08:29
To day the foot paths are being laid with cement bricks. The stretch between SWD and the tar road is cleared and dug up to make way for the bricks before laying.
Notic the step at the SWD at far left side. The scooters are seen parked at the road side on the RHS. Lot of muck seen is to be cleared. Laborious work indeed!

psaram42 - 6 May, 2013 - 08:46
There is a BDA park opposite to my house. Observe the newly covered SWD where the new load of brics are stored
The SWD is covered partially by small size RCC covers. This leaves an unwanted extra step which is hazaedous!
The BBMP engineer does not care to put a mud trap at the rain water entry point, as seen in the picture above. A testimony of the kind of slip shod work.being carried out indeed!

pathykv - 7 May, 2013 - 04:48
Dear Mr. Anantram,
As I suggested, you should ask the engineer what Norms/Standards are
following and who is designing these constructions.
K.V.Pathy
PRAJA.IN COMMENT GUIDELINES
Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!