Designing Storm Water Drains

184

Written By psaram42 - 13 May, 2013

Bangalore environment groundwater Storm Water Drains Rain water harvesting

Currently the 9th main in HAL 3rd stage, Bangalore is witnessing SWD refurbihing and foot path tiling activity. The space between the SWD and tared portion of the road is being tiled.

The Electric poles carry exposed live wires at hazardous tree levels. Trimming of trees is required on an yearly basis. The selection of trees planted are far from satisfactory. New Telephone connections require constant meddling of the roads.

This event is for starting a contnueing dialog with BBMP, elected reps and the public for better of road standards, for the city as a whole.

The SWD design will be the main agenda for the day.

Venue:- Gandhi Park, 9th main HAL III Stage, Bangalore 560075

                 [In front of # 1669 - Asha Kiran Stone house]

COMMENTS


SWD Design- Event

pathykv - 13 May, 2013 - 06:34

Dear Mr. Anantram,

The venue is not given. Who are all invited?

I will join.

K.V.Pathy

Mr. G Ravindranath ward 58-AE from BBMP has kindly agreed to be present and interact with us.

 

 

 


PRAJA.IN COMMENT GUIDELINES

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!