Work is on, June 2010 new date
Written By silkboard - 22 March, 2010
Bangalore Whitefield Transportation Infrastructure Flyovers and underpasses Kadugodi
Work is on, many have confirmed. June 2010 is being comunicated as the planned end date for remaining work. Residents or commuters of the area should post pictures here to keep tab on the work, so that all get to know if June 2010 date is realistic.
Given all the new information, there is no need for planning a protest right now, let us wait till end of May. Sounds good?
COMMENTS

Work is on, June 2010 new date
suryakamal - 22 March, 2010 - 09:54
Hi,
Yes, for sure work is in progress.
Apart from the work next to police station, over the past week, two iron girders (more like scaffoldings) have come up between the tracks (cant figure out whether they are some kind of support for erection work or will they stay there for ever!).
I haven't had chance to take photographs; but, will try to share in the next couple of days!
Cheers.....Surya

Work is on, June 2010 new date | Photos
suryakamal - 23 March, 2010 - 15:34
Hi,
Here are some snaps (not good quality) taken this evening on my mobile! Hope to do a better job - may be over this weekend.
http://picasaweb.google.co.in/suryakamal/Bridge22ndMarch2010#
Cheers...Surya

silkboard - 25 March, 2010 - 09:55
Will be fun to record the critical part of work - putting that long span over the temporary support structures. Should ask them when they plan to do it. I am sure it will be done in the night. We can go record with our night cams!

Latest update about Kadugodi ROB
suryakamal - 26 March, 2010 - 06:26
Hi,
Here is a mail in circulation in Chaitanya group.... I haven't physically checked; but, looks like a good update :)
Over the weekend, will try to take some snaps and share!
Cheers...Surya
The wait is almost over – after years of staring at the ramps of the ROB that went nowhere – we're happy to report that the first piece of steel girder over the rail lines was put in place at 1:30 AM on 26-March-2010.
The work started just past midnight after the electric lines were disconnected from mains over most of the tracks. 2 tracks on the ashram side were still operational. A Huge crane was brought in and locked in place at around 12:30 AM. The crane did a dry run – turning a full 360 degrees with its lifting arm fully extended to ensure that it did not damage any electric lines. A big truck brought the first piece of the steel girder ( 16 mts long ) along the crane and then the actual work started. The huge steel girder was hoisted up, turned, expertly guided between the electric lines and placed safely in its designated place. The entire operation was beautifully orchestrated by a crew of around 50 people from railways and the contractor. I know it sounds a bit simple but considering he weight that the crane was carrying and the narrow distance between the electric lines – this thing should be on Discovery Channel.
The site engineer shared some information with us – here a brief of what we learned :
- There will be 2 steel girders laid over the railway tracks. Each girder will be 42 meters (m ) long.
- Each girder will have 3 pieces, 2 pieces of 16 m each ( these start from the end of the ramps ) and a middle piece of 10 m.
- The plan is to put the first 16 m piece ( kadugodi side ) and the middle ( 10 m ) piece in place today.
- Tomorrow night they will put the 3rd 16 m piece ( ashram side ) in place.
- Once all 3 pieces are in place they will be welded and riveted together.
- Once this monolith is ready, it will be shifted by a few meters ( parallel to it's current position ) , so that the temporary support structure can be used to assemble the 2nd girder.
- Once both the long 42m girders are in place – they will be cross connected with more steel and a steel sheet will be laid over them and that will form the base of the eventual road.
We also learned from people at the site that there might not be any weight limit on the ROB – meaning that school buses may be able to go over the bridge.

Work is on, June 2010 new date | Photos
janiannapurna - 25 March, 2010 - 09:32
Thanks Surya for the snaps.Looks like something is really happening there.Let's hope for the best
PRAJA.IN COMMENT GUIDELINES
Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!