SWR Tenders for Bangalore division - Will it help Namma Railu cause?

192

Written By Sanjeev - 5 January, 2013

Bangalore Infrastructure CRS SWR Commuter rail Commuter rail Tender

Here I am trying get all Tenders called by SWR in Bangalore Division. These infrastructure will  help CRS implementation.

 

1. Yeshvanthpur: Extension of FOB from Platform 2/3 to 4, 5 & 6

Tender called on 28.05.2012  value : Rs 78.42 Lakhs,  Duration of Completion 6 months from Tender award.

Till now no progress on the ground  and this is not getting connected to METRO station which will be drawback.

http://www.swr.indianrailways.gov.in/TenderDetails_cpp.jsp?T_ID=100&lang=0&id=0,3

 

 

COMMENTS


Construction of RUB near LC No. 4 & 4B at km 7/600-700 on Yeshwantpur - Tumkur line & Yeshwantpur Bypass on Outer ring road near Jalahalli for the entry to sleeper factory, coach stabling & pit line near Yeshwantpur yard (YPR-TK/92)

http://www.swr.indianrailways.gov.in/TenderDetails_cpp.jsp?T_ID=955&lang=0&id=0,3

Tender work cost : Rs 2.13 Crore  tender called 22.12.2012

ROB at Hoody costing Rs 7.86 Crore

Sanjeev - 5 January, 2013 - 12:02

Construction of approaches on both sides of Road Over Bridge in lieu of LC.No.133 at Railway Km.337/400-500 between Krishnarajapuram - Whitefield Railway station near Hoodi.( ROB/LC133AP)

http://www.swr.indianrailways.gov.in/TenderDetails_cpp.jsp?T_ID=27&lang=0&id=0,3

Tender was called in June'2012,  any progress on the ground  and how this will help vechile movement and also Train movements, any one has throw the light on this

Construction of Road Over Bridge in lieu of LC No.131 at Km.192/600-700 (Sarjapur Road) between Heelalige and Carmalram Railway station.(ROB/LC-131)

Cost Rs 17.27 Crore

http://www.swr.indianrailways.gov.in/TenderDetails_cpp.jsp?T_ID=124&lang=0&id=0,3

Tender was called in July'2012 ,  any progress  as time rovided is 12 Months.

Yeshwanthpur - Pro construction of station building on PF-1 side

Cost of Tender Rs 62.36 Lakhs, Tender called,   on 01.06.2012, 6 months for completion

http://www.swr.indianrailways.gov.in/TenderDetails_cpp.jsp?T_ID=152&lang=0&id=0,3

SW-I: Yeshvanthpur - Pro Provision of IRS type platform shelter for 5 bays on PF No.6 on TK end. SW-II:YPR-Provision of IRS type platform shelter for 10 bays on PF No.1 on SBC and TK ends.

Tender work Cost : 1.16 Crore, Tender dt : 26.09.2012, period for completion 6 months

http://www.swr.indianrailways.gov.in/TenderDetails_cpp.jsp?T_ID=591&lang=0&id=0,3

These small things including FOB extending to 4,5 & 6 PF should help id disburing passengers fast.

There should be some plan to improve Nayandahalli station for easier interchange to ORR bus stop and Namma Metro Station. Also for the proposed Light Rail.


PRAJA.IN COMMENT GUIDELINES

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!