HOT TOPICS
SPOTLIGHT AGENCIES
Presentation on CRS
Written By idontspam - 21 May, 2010
Prepare a presentation on CRS
COMMENTS
working on the details for CRS bit busy in the office for next couple of days. Will prepare & will upload the details.
For Presentaion of CRS, we need to cover all the areas in few slides, but as you told we need to put routes with maximum coverage with more distance. CTTP has done short study with short distance coverage only, Local Train concept will work for more distance with maximum coverage. we should take the following root :
1 : Kengeri / Bidadi to Devanhalli 2. Yesvanthpur to Hosur 3. Kengeri Whitefiled / Bangarpet 4. Bangarpet to Devanahalli and Dodballpur via K R Puram
Do not take Yesvanthpur to Nelamanagala for presentation. Do not consider other infrastructure projects, we will concentrate on CRS.
What info is needed for CRS Report?
kbsyed61 - 21 May, 2010 - 14:49
Murali, blrsri, N, IDS and SB,
Thanks for all your efforts in materializing this meeting. It seems a very good meeting and that too with an action item.
I am very g;ad to note that we have already started on that path. Can one of you post a list of things or information that we should collect for preparing the report on CRS?
BTW what would be the objective of this report? I believe it should present the CRS infrastructure in a comprehensive manner.
I am sure it should have 3 components:
- Short Term - Improving the existing CRS service(YH) to make it purposeful
- Medium Term - Adding more routes on existing infrastructure
- Long Term - Plan for a consolidated CRS system that is well integrated with other PT system
Hope this is what we might have to work on.
As usual, my services are available for collecting info, drafting reports, presentations and follow up.
Syed
idontspam - 21 May, 2010 - 15:47
Pl check the presentation storyline attached with this task and provide feedback.
n - 21 May, 2010 - 15:53
Good presenation. Some suggested tweaks:
- The "Where" can be expanded to include an outline of the existing focus lines that will be expanded by Narayan.
- An initial frequency of 10 mins is probably unrealistic; probably 20 (or even 30) mins to start with and then increased as required.
- Some verbiage on "problems" (railways not interested in suburban service because of bleeding - reasons for bleeding)? Solutions (SPV, PP already indicated).
silkboard - 21 May, 2010 - 10:35
As we discussed yesterday, I have contacted Narayan for help with a solid and clear CRS map for Bangalore showing phase 1 focus routes, stations, new stations, and big catchment areas.
Need to be clear on what routes we are putting up in this presentation cum report. Lets do two, from this list
- Hebbal Anekal line - for sure, there is no Metro or Elevated road coming to cover the catchment areas here
- Yeshwantpur - Nelamangala (but they already have an elevated road coming there)
- Yeshwantpur - Devanahalli
Not that other lines are not important. But lets pick where chances of a competing proposal are lower (Metro, BRT etc), and there should be large catchment areas today or tomorrow.
Further, taking just 1 or 2 lines and detailing them will make for a better presentation than talking high level for the 9 tracks mentioned in CTTP.
PRAJA.IN COMMENT GUIDELINES
Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!