E-City Rail Link vs HSRL

178

Written By s_yajaman - 25 February, 2009

Bangalore Bangalore South Namma Metro suggestion Rail Electronics City mass transit public transport

Mr.Sreedharan made a few statements about

a, Metro being unviable to airport - needs 40000/hr traffic.

b. Private players who have come forward will get put off by talk of alternative plans

Here is a plan for the private players which will better serve Bangaloreans

Build a N (Normal) SRL from Indiranagar Police Station (branching off from NM) to Electronics City via IRR and Koramangala and then via NH7.  The distance would be less than 35 km for sure.  There are enough people who commute to E-City through the day.  There is BPO work that starts when other businesses are shutting down.  People arrive through the morning to work. I am sure at least 200,000-300,000 people work in that area.   This will be on the same PPP basis and tickets will be priced at a slight premium to ensure that profits can be made.

With this, Kormangala and HSR residents get access to NM going towards Majestic/Mysore Road/Malleswaram, etc..  Add a link from Byappanahalli to ITPL and a lot more traffic will be generated on NM.  All this will probably cost less than the HSRL. 

Any takers?

Srivathsa

COMMENTS


Metro along Hosur Rd Doubtful

Naveen - 25 February, 2009 - 13:10

SB,

I don’t think there is any doubt about the need for a mass transit to EC. The CTTS study has a tabulation for traffic volumes at screen-line locations, extracts are as follows :
 

  • RUB near Benniganahalli /NH–4:  Vehicles–80,876;  PCUs–83,078   (9–10 AM, 6–7 PM)
  • RUB near Marathahalli /ORR:  Vehicles–71,678;  PCUs–83,183  (9–10AM,  5.15–6.15 PM)

Another tabulation from the study is for mid-block locations. Some extracts are as follows :

  • Hosur Road (NH-7) CSB Junction:  Vehicles – 62,514;  PCUs – 66,116 (9–10 AM, 6–7 PM)
  • Airport Road, Kemp Fort :  Vehicles – 30,146;   PCUs – 29,589  (9–10 AM,  6–7 PM)
  • Old Madras Road near NGEF :  Vehicles – 68,781;   PCUs – 70,039  (9–10 AM,  6–7 PM)

Thus, the numbers are there to justify a mass transit corridor.

Further, CTTS has also recommended a phase-2 Metro alignment along Hosur road from EC to Yelahanka. Thus, there is enough legitimacy for the route, no doubt.

However, the government, hell bent on building the toll-way along Hosur road, may have already compromised commuter interests by signing agreements (?), which might include clauses against a mass transit route since the builder /operator of the tollway may lose revenue heavily if the Metro is aligned through Hosur road.

Srivathsa,

Theoretically, your calculation does indeed make sense, but people, especially the car users have a funny way of criticizing the traffic & the authorities, but will never budge out from their cars – they expect others to get out of & take the bus or train, whilst remaining stubbornly seated within their cars. This has been borne out in so many world cities & also in Delhi, where after so much of study & work, the BRTS is in danger of being dismantled due to opposition by the car users & fuelled by the media. Thus, your estimation of 200,000 trips per day is on the high side as all car users will not switch over & many others cannot afford these prices for daily commutes. Thus, private funding may be difficult, unless other substantial incentives, such as rights for land development along the corridor & stations are offered - a la hyderabad !

Installing a mass transit is just the beginning. Reducing street congestion is quite another matter. Unless severe restraining tools are used (such as high costs for parking, tolls, taxes, etc), cars will continue to dominate the streets.

The best example of course is the Hosur road tollway. How did this come about ? If the industry & car users had demanded a Metro strongly enough, things would have been fine, but the choice has been an uninterrupted overhead road that neglects large social segments below.


Srinidhi,

I think what “pre-feasibility” study means is that they are just conducting a preliminary check to see if such an alignment for the Metro is possible. 3 months is a short time (!) as the whole route has to be surveyed, etc. We were told that DPR (Detailed Project Report) would take about 8 months to prepare. Construction will be according to the DPR.

HSRL has been proposed for Airport

Naveen - 25 February, 2009 - 06:20

HSRLhas been proposed for fast, mass connectivity to airport. What you suggest are of course extensions to namma metro to include E-City & ITPL, which in any case, are planned in phase-2. PPP for Metro for urban travel needs will not find takers - if the ticket pricing is set high, daily commuters, who form the bulk of users, will not use it. Thus, profits are doubtful. This was why the UB group had pulled out of the erstwhile ELRTS project.

There are other obstacles - development of common ticket issues which is, by itself quite complicated + revenue sharing when commuters interchange between lines. Say, a commuter first uses this PPP train followed by NM - how much of what he pays goes to the PPP consortium & how much to Namma Metro ? These problems are why Monorail also may not take off since tickets have to be paid for individually, which can then become expensive for the daily commuter.

HSRL is different - ticket prices can be set high for air travellers as this is occasional travel & there are fewer daily commuters (airport workers, who can be subsidised from what air travellers pay). So, profits can be generated. Thus, private players will bite - according to recent reports, there are some 27 parties already interested in investing in this. So, PPP is possible & utilization of public funds can be minimised.

Target market - E City employees

s_yajaman - 25 February, 2009 - 06:35

Naveen,

First - expensive vs. what?  A person from Koramangala or Indiranagar will spend 3-4 litres a day on petrol + 2-3 hrs on the commute.  If I am coming from Vijayanagar and can reach Indiranagar police station in 25 mins and then E-City in another 30-40 mins @ Rs.40 each way, is it really expensive.

Second - if HSRL can break even and make money at 15000-20000 trips/day @Rs.150/ticket, then E-City Rail can surely break even at 200,000 trips per day @ Rs.20-25/ticket.  Have a bus interchange at Silkboard and one can reach BTM, Jayanagar, etc.

I have not seen any Phase 2 plan that has E-City in it - is it available on BMRCL website?.  E-City, like it or not, is our own version of the CBD. 

Srivathsa

 

 

 

News on Metro to BIA and EC

srinidhi - 25 February, 2009 - 07:04

Srivatsa -
Found this piece on the web about the Electronic City connectivity..Looks like BMRCL is doing a pre-feasibility study for 3 months!

http://www.hindu.com/2009/01/12/stories/2009011259070400.htm

What is a pre-feasibility study? Sivasailam talks that BMRCL will need to decide on the route..but is already working with a map?! and 3 months??

You have identified a corridor

silkboard - 25 February, 2009 - 07:53

Srivathsa, you have identified a viable corridor for a mass transport solution. CTTP too called it out, and they proposed in there was BRTS covering this corridor (I think we talked this last year) till Silk Board junction and Metro aligned on Hosur Road.

The solution depends on volumes on this corridor. Normal Rail, LRT, Metro, Mono or BRT - do I really care? Definitely not. Indira Nagar to Koramangala in 15 minutes, Silk board in 25 mins, E-city in 45 mins. Add a branch from emerging Sarjapur Road area, integrate with some mass transportation mode on Outer Ring Road. I will take it. Tell me the time and price to pay, and the quality of ride and interchange, thats all. Don't ask me for mode because I don't really care.

Having said that, the solution (which mode) would depend on two key inputs

  • volumes on this corridor
  • integration plan with existing modes of travel along (parallel) and across (perpendicular) this corridor.

If we can dig out some corridor volume data, we can have some real meaningful discussion. There are two possible sources for this data. RITES or CTTS itself (as they identified this as a corridor, and put Metro on Hosur Road). And BMRCL, as they phase 1 phase 2 phase 3 planning will definitely be based on corridor volume estimations.

Naveen - how do we get this data. Lets figure who to ask before considering RTI.

BTW, the current solution being worked is Big10 from Vellara Junction to E-city. Big 10 from Domlur to Velara junction, and then from there to E-city - this would take 1 hr+ in today's mixed traffic conditions. I have heard some talk of dedicated lanes at selective stretches as well, but not seen any concrete plans yet.


PRAJA.IN COMMENT GUIDELINES

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!