Posts : Traffic

Part II: Traffic Restraining Measures

Naveen - 10-APR-2008

Traffic restraining measures

CTTP Section 7.14.1 (Reducing Private Vehicle Use) states “There are two ways to restrain the growth of private vehicles on road: either by pricing policy or by providing better level of service on public transport”, & recommends the following, amongst other measures : Parking facilities provided /planned in side the CRR should only be for Short term parking with high hourly charges.

Part III: ITPL and surrounding areas not covered

Naveen - 10-APR-2008

Dense areas leading up to ITPL & surroundings not covered

The recommended Metro transit corridor (in Phase-2) to Whitefield is shown passing along the existing Airport road straight east towards Varthur, thence northwards towards Whitefield Commuter railway station. Thus, the more developed areas in Whitefield, where most tech companies, businesses & high-rise residences are situated, are not covered. It may be far more functional if this route could turn left at Karunashraya & pass through Kundalahalli cross, turn right opposite Graphite India & pass through KIADB area, ITPL & Kadugodi before aligning with Whitefield road. There are no direct mass-transit routes otherwise recommended to these points in the CTTP, & a TTMC proposed at ITPL may not help as commuters would need to interchange modes. Quality seeking professionals, who are sensitive to traffic delays, detest inconveniences such as transfers, any time penalty that usually cannot be avoided when changing modes & who generally use private vehicles, commute daily to these areas, & will also start preferring the Metro with the convenience of this realignment & direct connectivity. An additional rapid bus corridor can be arranged from Marathalli /Karunashraya to Whitefield CR station via the broad Varthur road to fill the gap there as a result of this re-alignment, if volumes justify the need.

Part III: South East CBD areas not connected

Naveen - 10-APR-2008

South East CBD areas not connected.

The attached Sketch “CTTP–No MRTS within SE CBD” indicates that the very large area marked by a red outline – the South-Eastern quadrant of the inner core area within CRR that has important CBD points such as JC Rd (105,000 PCUs), KH Rd (96,000 PCUs), Lalbagh Rd (61,000 PCUs), Corporation /Hudson Circle & Richmond Circle does not have convenient Mass transit within easy reach. Very large nos. of commuters travel to activity centers around these areas daily & school going children /staff to various schools & offices arriving by private vehicles choke up Richmond /Residency roads during school times. The only TTMC at Shantinagar may not attract these commuters due to the inconvenience of long distances, transfer to buses & the time delay involved.

Part I: Commuter Rail System

Naveen - 10-APR-2008

Commuter Rail Services (CRS)

There has been frequent & repeated mention of CRS on existing rail tracks in several previous study reports (since 1981), but with no follow up action so far. The CTTP-2007 report has recommended an increase in the CRS network to 204km in three phases. It is not clear if this is being seriously pursued with the Railways. Some land acquisition is also involved, & there are many questions as to which body will build & operate the CRS network, & also the type of rolling stock & service /quality levels, ticket pricing, etc.

Part I: Airport Rail Link - The Monorail Option

Naveen - 10-APR-2008

Airport Rail Link – the Monorail Option

The Airport-City rail link has been a much visited topic, but nothing seems to have been finalized, so far. The central government had recognized mass transit systems as vital for larger cities’ needs & had previously offered assistance to the tune of 30% (similar to Metro-rail systems), which is a small contribution – 70% still has to be met by state government & BIAL, including loans & debts. Negotiations always seem to have ended in deadlock as agreements over revenue sharing are uncertain with changing stands by the government/s involved. It appears that the central government has now changed its stand & is willing to provide more participation as this is a vital sector that can have far reaching consequences for the country’s economy.

Part I: Monorail

Naveen - 10-APR-2008

Monorail
About 60 kms of Monorail /Light rail has been recommended in the CTTP report on various potentially high-growth corridors (Western portion of ORR & Bannerghatta road) in the CTTP report.

Traffic/Transport Issues & CTTP-2007

Naveen - 10-APR-2008

There is deep concern about unmanageable volumes of traffic, the deteriorating road discipline & difficulties in commuting, all calling for very urgent interventions.

Traffic /Transport Issues & CTTP-2007 - 3 (Projected Mass Transport - Desirable.JPG)

Naveen - 10-APR-2008

This image was uploaded with the post Traffic /Transport Issues & CTTP-2007 - 3.

Traffic /Transport Issues & CTTP-2007 - 3 (CTTP - No MRTS within SE CBD.JPG)

Naveen - 10-APR-2008

Part II: Non-Motorised User Facilities

Naveen - 10-APR-2008

Pedestrian Facilities
Excerpts from various sections of the CTTP report are as follows :
3.13.1.9: There is high pedestrian traffic in core area and some other areas in Bangalore. Footpath facilities are generally not adequate and their condition is deteriorating. Therefore up gradation of their facilities is very important.
5.5.8 (Preferred Strategy for Transport Development): Special facilities for pedestrians within the entire network specially in the core areas; Pedestrianization of selected shopping streets in side the core area going to be served by Underground sections of Metro; Provision of pedestrian sky walks, under passes, footpaths and other road furniture along the roads where necessary.
7.9: Recommends as many as 78 roads within ORR & 54 roads outside ORR for improvements & widening.
7.11.2.2 (Foot paths): Recommends a width of 2.0m for sidewalks for about 350 kms of city roads.