Posts : Flyovers and underpasses

Kadugodi ROB meet

sanjayv - 13-JAN-2010

 Meet at Kadugodi rail over bridge location. Time: 11 AM

  • Take pics of work progress and post
  • Finalize the RTI application
  • Plan meeting local MLA or SWR officials

 

New completion date for Kadugodi flyover!?

Raghu Nandana M - 26-DEC-2009

See Page 18, Times of India - December 26,2009, SOUTH WESTERN RAILWAY (ROB-WFD-57R)

LINK FOR THE Same on the epaper:

http://epaper.timesofindia.com/Default/Scripting/AdPrimView.asp?BaseHref=TOIBG/2009/12/26/18/Img/Ad0180300.png

Workgroup for Kadugodi flyover (Whitefield)

mbhatia - 15-DEC-2009

Project group to pool together efforts from various members to put pressure for action and transparency for completion of work on Kadugodi railway overbridge.

[Create by admin on behalf of mbhatia]

Bridge to Nowhere ! Hope now.

adityaselect - 18-NOV-2009

 Hi Guys,

I have sent a mail along with the attached photograph of Kadugodi flyover to our CM.

The same has been forwarded by him to BMP. I am hoping things may finally turn ourside now.

Cant forget to mention; It was a plesant surprise that our concern was acknowledged within three days.

 

Here is the picasa link - 

ORR/OMR - Extra loop at K R Puram

idontspam - 8-NOV-2009

Here is the plan BDA is going ahead with for this stretch. Anybody know what loop this is? Any idea what the improvement is? 

Rs 15 crore for the construction of additional loop and improvement of junction at K R Puram flyover

ORR bottleneck - Bhadrappa Layout

idontspam - 7-NOV-2009

It is a good move by BDA to make the ORR Bhadrappa layout junction signal free. This junction assumes significance due to the fact that most of Sanjaynagar and RMV layout and gazillion other layouts in between use the Dr Rajagopal road/Gundappa road to reach ORR go towards the airport.

Petition: Say no to Tagore Circle underpass in Bangalore

indian - 5-NOV-2009

Bangalore is one of the 59 cities to which Ministry of Urban Development or MoUD has sanctioned grants for public transport buses.

This grant is linked to conditional reforms in the transport sector in cities that includes higher taxes on private cars, dedicated funds for public transport, parking policy as a car restrain measure and bus sector reforms.

Poor design of flyovers lead us nowhere in solving traffic problems

Vasanth - 29-OCT-2009

 All over Bangalore, there is a galore of small small flyovers and now underpasses. But, none of them are constructed with thorough thought process and planning behind it. Usual mode of construction of flyover is to have 4 exit ramps and 4 entry ramps in semicircles like we have seen in foreign countries as well as in our NICE Somapura road junction.

Tagore Circle Underpass work starts - BBMP, Why?

Arun - 26-OCT-2009

My earlier post on this and Naveen's detailed alternative too

http://bangalore.praja.in/en/blog/arun/2008/11/05/help-required-design-alternatives

Service Life of Elevated Metro

blrsri - 9-OCT-2009

 There have been numerous debates on wether we take metro underground or do we have it on elevated structures..these have been mostly related to the following:

1. Number of tree cut and properties damaged

2. Cost of going underground