HOT TOPICS
SPOTLIGHT AGENCIES
BIAL Airport Concession Agreement, Its future exapansion, UDF charges, No infusion of Capital by Promotors
Written By Sanjeev - 14 September, 2013
BIAL Bangalore PPP HAL Airport Aviation Action Aviation
Here we have the Concession Agrement signed between BIAL Managment and GOI on 5th July'2004
Artilce 5.2.1 and 5.2.2 of page 22 gives Exclusivity :
No new or existing airports shall be permitetd by GOI of either Domestic or Internation within Aerial dist of 150 Kms from BIAL Airport before the Twenty-Fifth Anniversary of the Airport Opening
http://aera.gov.in/documents/pdf/Annexure%20V%20cp%2014-13-14.pdf
Consultation paper on BIAL UDF charges deciding
Page No 13 / 2..2.5
http://aera.gov.in/writereaddata/consultation/333.pdf
Airport Exansion Plan :
Jacob Consultance report for BIAL expansion on Page : 50, 74, 76 and 120 will give glimpse of the Ph2 expansion with 2nd Runway and looking for 3rd runway wih further land acquiring for BIAL
http://aera.gov.in/documents/pdf/Annexure%20I-B%20cp%2014-13-14.pdf
Earlier Praja Reference :
BIAL Capacity only 9.87 million passengers
http://praja.in/en/discuss/forums/2008/07/bial-capacity-only-987-million-passengers
BIAL Whats working and Whats not working :
http://praja.in/en/discuss/forums/2008/05/bial-whats-working-and-whats-not?page=1
Retaining HAL Airport
http://praja.in/en/discuss/2008/02/retaining-hal-airport?page=1
COMMENTS

Hosur Aerodrome close to Electornic City capabale of 737 Boeing
Sanjeev - 28 August, 2015 - 08:00
Taneja Aerospace TAAL owns a private airfield (Licensed) located at Hosur, 50 km from Bangalore city. The airfield enjoys a strategic location - it is a twenty-minute drive away from Electronic City, the hub of the software industry in Bangalore. In terms of time, the airfield is actually closer to Electronic City than Bangalore Airport. The airfield is capable of receiving Airbus A 320 and Boeing 200-900 / B737 – 200 -900 class of aircraft and is equipped with a Night Landing Facility as well as with basic Navigation Aids. Support services available at the airfield include refueling, Fire Fighting equipments, parking, aircraft hangar accommodation, crew rest area, guest house, aircraft maintenance facilities, aircraft cleaning services etc.
Airfield & MRO facility agreement with Air Works India (Engg) for establishment of commercial Aircraft Maintenance and Operating Aviation Infrastructure - Airfield & MRO Division services at TAAL's private airfield (Licensed) at Hosur, near Bangalore. The runway at this airfield is capable of accepting Airbus A 320 and Boeing 737 Series class of aircraft and the hanger is capable of accommodating Narrow Body aircraft.
http://www.taal.co.in/Aviation-Infrastructure-Airfield-MRO/mro_airfield_info.htm
http://www.taal.co.in/landing_parking_info/landing_parking_info.html
With Runway : 2287 Mtrs and 45 meter wide as against BIAL airport runway : 4000 meters and 60 meter width.
Hosur Airodrome has 22.25 Meter ATC tower against 65 Meter tower of BIAL.
Now if one looks back why Infosys Cheif Murthy was asking about airport at Hosur close to Electronic city.
Any way, Bangalore has five runways :
BIAL, Yelahanka, Jakkur, HAL and Taneja at Karnataka Boarder.
Will BIAL Bangalore able to get MRO business, already Hyderabad has, Delhi, Mumbai and now Hosur taking off.

abidpqa - 14 September, 2013 - 13:00
Concession clause need to be questioned in Competition Commission. Bangalore is growing and capacity cannot be fixed arbitrarily. Other big cities have many airports. If this clause is for other reasons like traffic control, will it change after 25 years. But I dont think HAL airport need to be reopened. It needs to be completely closed down and given for real estate development.

UDF Charges calculation by AERA authority & expected by 1st Oct
Sanjeev - 14 September, 2013 - 11:31
Ref Page No : 199 Table 128 and Page 203 table 130 give how much AERA is planning to pass the order.
BIAL Managment proposed Tariff on Page : 196 Table : 126
Page 291 : BIAL Promotors have No further equity infusion will be possible into the Airport for Expansion
Capital amount needed was Rs 649 Crores and same BIAL managment has spent Rs 1100 crore to acquire Rs 110 Crore stake in this project
http://aera.gov.in/writereaddata/consultation/333.pdf
Also GOK and GOI r able to spend capital in METRO to the tune of Rs 40,000 Crore by means of own funds and Loans, but these not even 10% of the METRO project cost, GOI & GOK not ready invest.
BIAL Managment agreeing for Hybrid Till Model for UDF charges with 30% cross subsidization after AERA has taken tough stand and decision is expected after 19th Sept which last date for filling objection.
Also GOK is keeping quite on this matter means, its agreeing to BIAL promotors decision even though it has 13% stake and given capital Rs 350 Crore without interest for 10 Years.
http://aera.gov.in/writereaddata/announcement/480.pdf

HAL Airport can be re-opened after 20 Years
Sanjeev - 14 September, 2013 - 11:36
As per Concession clause mentioned above, its 25 years other Airports are not allowed except Mysore and Hassan as Domestic within 150 Kms Aerial Dist.
GOI and GOK should make plans to re-open HAL airport by 2033 which is leagally allowed..

murali772 - 16 September, 2013 - 10:04
It (HAL airport) needs to be completely closed down and given for real estate development.
Seriously??? But, don't we have enough of real estate development happening already?
PRAJA.IN COMMENT GUIDELINES
Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!